|
Public document to be completed by the Contracting Authority CORRIGENDUM TO THE PROCUREMENT NOTICE Technical assistance for coordination of
the Private Sector Enabling Environment
Instead of 20. Initial period of implementation of tasks and possible extension of the contract 36 months with the possibility of extending the contract duration and/or scope subject to the availability of funding, up to a maximum not exceeding the length and value of the initial contract. Any extension of the contract would be subject to satisfactory performance by the Contractor. Please read 20. Initial period of implementation of tasks and possible extension of the contract 30 months with the possibility of extending the contract duration and/or scope subject to the availability of funding, up to a maximum not exceeding the length and value of the initial contract. Any extension of the contract would be subject to satisfactory performance by the Contractor. |
